The Soil-ID method

  • Placing sheet piles
  • Placing injection tubes with a sheet pile
  • Connecting and filling injection tubes
  • Applying water-repellent layer
  • Dry Excavating

Links:  soil investigation      advice   construction pit           the Stone Age             Advantages

©2015 Soil-ID    -     Disclaimer    -    Internetbureau: Webton.nl